How Long Does a Squarespace Design Project Take?

The building is the quick part. Almost the whole timeline is set by content and by how fast decisions get made, which means it is set by the client rather than the designer. That is worth knowing before you agree a date.

Updated: July 2026
Written by: Andrew Odgers, Managing Director
Reading time: 10 minutes
A span rather than a number

The Range, And Why It Is A Range

A small site whose content already exists can be finished in four to six weeks. A site of similar size whose content has to be created runs to three or four months. The gap between those two is almost never the website.

What puts a project at the quick end. Copy already written. Photographs already taken. A clear view of which pages are needed. One person able to approve things. No existing site to replace.

What puts it at the slow end. Content that has to be written from nothing. Photography still to be arranged. A structure nobody has settled. Several people with opinions. An existing site carrying traffic worth protecting.

Notice what is absent from both lists. Neither of them mentions how complicated the site is, how many sections each page has or how bespoke the styling needs to be. Those affect the fee. They barely touch the calendar.

Which makes this one of the few projects you will commission where the client controls the timeline more than the supplier does. Not through any failing. It is simply where the remaining work sits once a platform has removed the construction.

Five phases, unevenly sized

The Phases

Rough shares of a project that runs properly. A project that stalls has a very different shape, which the note at the end explains.

Structure and planning. Deciding what pages exist, what each is for and how somebody moves between them. Around a tenth of the calendar and the phase everything afterwards depends on.

Styling. Typography, colour, spacing and the visual rules applied across the site. Perhaps a sixth, running faster where the structure above it is settled.

Content loading. Placing and shaping words and images into the pages. Comfortably the largest phase, frequently more than a third.

Review. Around a fifth. The phase most often underestimated, because its length depends on people's availability rather than on the work in it.

Launch. Short in itself. It needs a date agreed in advance rather than a moment when everybody happens to feel ready.

Those proportions hold when material arrives as expected. When it does not, content loading swells to most of the project. Almost none of that time is anybody working. It is waiting, which is why a stalled project feels so much longer than it looks on paper.

Shifted rather than shortened

Why The Building Is The Quick Part

On a platform assembled from parts, several weeks go into work a visitor never sees. Setting up hosting. Installing the components that make a form or a booking work. Making them agree with each other. Checking the site behaves on a phone. Testing what breaks when one of them updates.

Squarespace removes all of it. That is most of what the subscription buys.

Here is the part worth understanding before you set a date. Removing that work does not shrink the timeline proportionally. It shifts it. The weeks that were being spent on construction are simply no longer spent, so what remains is the material and the decisions, which is exactly the portion nobody prepared in advance.

Which produces something that surprises clients. Squarespace projects frequently do not feel fast, even though the build genuinely is.

On a conventional project the waiting happens at the supplier's end, out of sight, where it feels like progress. Here the waiting happens at yours, in your inbox, attached to a task with your name on it. The same eight weeks feel considerably longer when you can see precisely what everybody is waiting for.

Four things, in order

What Actually Takes The Time

Written copy. The largest by a distance. Writing about your own business is slow work that competes with running it, which is why it slips repeatedly rather than dramatically.

Photographs. These carry a lead time nobody controls. A photographer has a diary, exteriors depend on weather, people have to be available. Booked in week one this costs nothing. Booked in week six it becomes the only thing standing between a finished site and a launch.

Structure and navigation decisions. Quick to make and slow to arrive, since they need somebody willing to choose rather than somebody willing to discuss.

Approvals. Not the reviewing itself, which takes an hour. The scheduling of the reviewing, which takes a fortnight.

Which explains something that sounds wrong until you see why. A five page site can take considerably longer than a twenty page one.

Twenty pages of content that already exists is a loading exercise with an obvious end point. Five pages of content that does not exist is a writing project with no natural end, because there is always a better way to phrase it and nobody is ever quite finished. Page count measures the smaller half of the work.

Longer, not shorter

Replacing An Existing Site

Owners generally expect a replacement to be quicker than a first site, on the reasoning that the content already exists. It is reliably the other way round.

Content has to be carried across and judged. Every page needs a decision: keep it, rewrite it, merge it or drop it. That is slower than writing something new, because each decision is arguable and somebody in the business usually wrote the original.

Addresses have to be redirected. Every page that moves needs a redirect from where it used to live, established before launch rather than afterwards.

Existing visibility has to be protected. A site already being found is an asset. A replacement can lose it. That constrains decisions a new site would make freely.

The old site keeps trading throughout. So there is a switchover to plan rather than simply a launch.

The underlying difference is one of kind rather than degree. On a new site you decide what to say. On a replacement you decide what to change, which involves defending or discarding work that already exists. Migrations are their own discipline with their own risks, covered in our site migrations guides.

Paid eighteen months later

What A Rushed Project Costs

Rushing a Squarespace project does not produce a worse looking site. It produces a worse arranged one, which is considerably more expensive and takes far longer to notice.

The reason is mechanical. Compressing a timeline removes the phases that leave no visible trace. Nobody skips styling, because a client can see styling and will comment on it within a day. Everybody skips structure planning, because nothing about the finished site announces whether the pages were arranged deliberately or simply seemed obvious during week one.

So a rushed project delivers something that looks finished and is organised around whatever was in somebody's head at the start, before anybody had thought about who the site is for.

What that looks like eighteen months on. Pages nobody can find. A navigation everybody has quietly stopped agreeing with. An enquiry route that was added rather than planned. Content in the wrong places because there was nowhere better to put it.

At which point somebody is asked to quote for a redesign. It is not a redesign. It is a rebuild of the structure, with the styling incidentally replaced, costing what the original should have. What that structure should have been doing is set out in how to design a Squarespace website that generates enquiries.

Both lists are real

What Delays Almost Every Project

Two lists. A page publishing only the first would be a defence rather than a warning.

On the client's side. Content arriving in pieces, then being revised after it has been placed. Photography booked once the design is finished rather than at the start. Several people holding opinions while nobody holds the decision. Feedback given as reactions rather than as choices, so nothing is actually settled. And the approver being away during the fortnight everything waited for them.

On ours. Not stating clearly enough what was needed and by when, which is the failure that causes most of the list above. Saving questions up and asking them in batches instead of the moment they arise. Beginning styling before the structure is agreed, then rebuilding it when the structure changes. And being vague about what finished means for each phase, so nobody can tell whether a stage is complete or merely quiet.

The useful thing to take from both lists is that almost every item is a scheduling problem rather than a work problem. Very little of the delay on a Squarespace project is anybody doing anything slowly. It is people waiting for each other, which is why agreeing dates for content and approvals at the start does more for a timeline than any amount of effort later.

Squarespace design

We agree the dates
before we start.

Content deadlines, approval windows and a launch date, settled at the outset with named owners against each. It is the difference between a six week project and a five month one. It costs nothing to agree.

What a Squarespace project covers:

Structure and page planning Starting point selection Styling and typography Section layout Content shaping and placement Forms and enquiry routes Mobile arrangement Testing and launch

Ongoing management afterwards sits inside our fixed monthly fee. Project work is quoted per site.

The full guide series

Fourteen guides.
One platform.

This page covers timescales. The rest of the series covers the role, cost, templates, what good design looks like, designing for enquiries, the platform comparisons and what to ask before hiring.

Questions people ask

Squarespace Project Timescales

How long does a Squarespace website take to build?
A small site whose content already exists can be finished in four to six weeks. A site of similar size whose content has to be created runs to three or four months. The gap is almost never the website itself. What puts a project at the quick end is copy already written, photographs already taken, a clear view of which pages are needed and one person able to approve things. Complexity affects the fee far more than the calendar.
Why is the build the quick part on Squarespace?
Because the platform removes the work a visitor never sees: hosting setup, installing components, making them agree with each other, mobile behaviour and the testing around all of it. On a platform assembled from parts that consumes weeks. Removing it does not shrink a timeline proportionally, it shifts it, so what remains is content and decisions. That is exactly the portion nobody prepared in advance.
Why does my project not feel fast?
Because the waiting moved to your side of the project. On a conventional build the waiting happens at the supplier's end, out of sight, where it feels like progress. On Squarespace it happens in your inbox, attached to a task with your name on it. The same eight weeks feel considerably longer when you can see precisely what everybody is waiting for, even though the work is proceeding normally.
Can a small site take longer than a large one?
Yes. It happens regularly. Twenty pages of content that already exists is a loading exercise with an obvious end point. Five pages of content that does not exist is a writing project with no natural end, because there is always a better way to phrase something and nobody feels quite finished. Page count measures the smaller half of the work, which is why it predicts a timeline so poorly.
Does replacing an existing site take longer?
Reliably, which surprises owners who assume the content already exists. Every page needs a decision to keep, rewrite, merge or drop. Each is arguable, since somebody in the business wrote the original. Addresses need redirecting, existing visibility needs protecting and the old site keeps trading throughout, so there is a switchover to plan. On a new site you decide what to say. On a replacement you decide what to change.
What does rushing a project actually cost?
Not appearance. Compressing a timeline removes the phases that leave no visible trace. Nobody skips styling, because a client can see it. Everybody skips structure planning, since nothing about the finished site reveals whether pages were arranged deliberately. Eighteen months on you have pages nobody can find and a navigation everybody has stopped agreeing with. The quote that follows is called a redesign and is actually a rebuild.